E&S Services with the help of Environmental Design Group worked together to solve a major erosion problem on this green infrastructure site for Northern Ohio Regional Sewer District. In this case there was too much surface water flow concentrated in one area which was causing erosion on site that needed to be mitigated. E&S installed a 150 ft. French drain and later implemented decorative rock channels utilizing existing materials on site to control the water on its path to the bio retention cell to improve the overall functionality of the site.